Transforming Oilfield Operations: BEST Pump and Flow’s Success with MSC Solutions

BEST Pump and Flow partnered with MSC to enhance their metalworking processes and overall efficiency. By implementing advanced tooling solutions, they achieved a 55% improvement in cycle times, gained 1,200 additional working hours per year, and saved over $1.1 million in machining and tooling costs.

BESTPandF

Overview

BEST Pump and Flow creates high-performance products for the oilfield service industry. They operate a state-of-the-art manufacturing campus with multiple plants totaling over 200,000 square feet with in-house engineering, robotic machining, state-of-the-art test cells, quality, service and repair. MSC has worked to gain their trust over the past 20 years as a partner who can help continually improve their metalworking processes, streamline their supply chain, and keep their workforce safe.

To learn more about MSC’s BNA, our unbiased process, and data assessment of your indirect supply chain, designed to identify customized solutions to empower performance, generate savings and maximize profit potential, call us at 800.645.7270.

We have assembly, we have testing, we have painting, we have machining, we have welding. It’s a lot of different venues that are covered by MSC, not just the machining portion. So knowing that you got a partner with knowledge in all those different areas is very, very beneficial and helpful.
Bryce Beckworth, Director of Manufacturing, BEST Pump and Flow

Challenge

Identified Opportunities To Improve Efficiency

  • One deep boring process required 2 machines to complete

  • Inserts were wearing out or not performing as expected

  • Finishing another part meant moving an 8000-pound steel block

  • 70 minutes were lost with every block moved to a second machine

Solution

An MSC Ap-Op™ for every Metalworking Challenge

  • MSC helped implement a special radial cutter that allowed boring to be done on a single machine

  • Provided upgraded inserts from MSC’s strategic supplier network that delivered 2x tool life

  • Building a special assembly eliminated unnecessary material handling

  • Increasing depth of cut per manufacturer recommendations to cut the number of passes in half on an existing application

Results

Increased Productivity and Significantly Reduced Costs

  • Cycle times improved by 55%

  • Gained an additional 1200 working hours per year

  • Saved $1,149,000 in machining and tooling costs

  • Saved $160,000 through managed inventory services

Continous Improvement

“We have assembly, we have testing, we have painting, we have machining, we have welding. It’s a lot of different venues that are covered by MSC, not just the machining portion. So knowing that you got a partner with knowledge in all those different areas is very, very beneficial and helpful.”

Bryce Beckworth, Director of Manufacturing at BEST Pump and Flow

Customer
  • Best Pump and Flow
Industry