Producing defective parts extracts a high cost, not only in material, labor and machine time, but also in disruption of production plans. Some shops create an illusion of reliability or predictability by including the occurrence of rejects in their production scheduling. In an instance when a customer requires 10 parts, planners might prepare for machining of 12 parts in anticipation that two will be lost/scrapped. Such efforts waste resources and time, producing either unacceptable parts or unneeded inventory.
Defective parts result when one or more elements of the production process are misunderstood or out of control. In a reactive response to part quality problems, some manufacturers put intensive effort into manipulating aspects of the production process that in the end are not consequential, in some cases ignoring important facets of the process.
For example, focusing only on maximum output by exclusively pursuing lower cycle times can damage the reliability of a metalworking operation. When an operation constantly runs at the limits of performance, exceeding those limits results in rejected workpieces and lost time and money. Part output must be balanced with machining parameters that provide a secure machining process.
On the other hand, the cause for rejected parts may be a separate issue from the productive elements of machining. In one case at a manufacturer of aerospace components, for instance, burrs remaining after machining made a certain family of parts unacceptable to the customer. Because deburring operations required manual work that added 20 percent to the cost of the parts, production output became a secondary issue behind the need to find a way to eliminate the formation of burrs.
Minimizing Unplanned Downtime
Maximum utilization of manufacturing resources requires the minimization of downtime which, most simply, is the period when the machine tool is not making chips. Some downtime is necessary and planned. This includes the time spent programming and maintaining the machine tool, installing fixturing, loading and unloading workpieces and changing tooling.
Manufacturers account for planned downtime in their production schedules. However, production of unacceptable parts results in unplanned downtime. When a rejected workpiece must be remachined, the time consumed originally machining it represents unplanned downtime and is wasted.
Traditionally, shops take a reactive approach to reducing unplanned downtime. When a problem halts production, the search for a solution begins. Rather than waiting to react to a negative situation, a better approach is proactive planning that recognizes key targets for the operation and steers the process toward them from the beginning. Most shops spend 20 percent in preparation efforts followed by 80 percent implementation and testing. The ideal would be to invest 80 percent in preparation and the rest in implementation and adjustments if necessary.
In preparing for a machining operation, a shop should analyze its targets and develop reliable processes to achieve them. The primary target is not always increased production rates. Although some manufacturing situations, such as automotive part production, remain true examples of high-volume mass production, manufacturing in general is moving more towards high-mix, low-volume scenarios.
In mass production, losing 50 or 100 parts when developing a machining process that will turn out hundreds of thousands of parts over a long period of time represents a tiny percentage of the overall volume and can easily be absorbed. However, in a high-mix, low-volume situation, the process must be as fully developed as possible before partmaking even begins. High-mix, low-volume scenarios can involve small batches, single-digit lot sizes or even custom one-part runs. In these cases, rejection of a few parts represents the difference between a profit and a loss.
Proactive Process Analysis
Proactive analysis of a machining operation, while ultimately of great value, can itself be time consuming. The reliability of a metal cutting process is affected by a multitude of individual factors including workpiece configuration and materials, equipment process capabilities and data, tools/tooling systems, human factors, peripheral equipment and maintenance issues.
The end use of a manufactured product, and thereby the workpiece material from which it is made, determines many of the important factors affecting process reliability. For example, the machining of critical aerospace components made of nickel-based alloys must be analyzed with the workpiece materials’ poor heat conductivity and tendency to work harden in mind. Use of sharp cutting tools and conservative machining parameters will provide a balance of productivity and productive consistency.
Conversely, aluminum workpieces are considered to be free machining, but cutting tools must be sharp as well as wear-resistant to withstand the material’s abrasiveness. Chip-control tool geometries as well as chip-management peripheral equipment such as high-pressure coolant and machine tool chip conveyors also play major roles in assuring the reliability of aluminum machining operations.
CNC and automation systems can help provide a high level of predictability in machining operations, but their effective operation depends on human input. Under-informed or careless programming will result in highly automated production of defective parts. (See sidebar regarding metalworking technology education). Human input is also a factor on the shop floor, where workpiece loading and fixturing and ongoing maintenance of production equipment must be executed properly to prevent unplanned downtime.
Conclusion
The goal of producing a certain number of workpieces of a desired quality, in a specified amount of time, at an appropriate cost is shared among all manufacturers. Achieving required part quality is paramount, because an unacceptable part is worthless no matter how quickly or cheaply it has been produced. Many manufacturers address part quality problems from a micro-scale or individual point of view. However, it is better to first analyze the overall targets of the manufacturing operation and plan proactively to steer processes to provide those results.
After developing reliable production processes of parts of sufficient quality, manufacturers should consider production economics of their specific situation in order to assure the profitability that enables a business to survive. And finally, selection of cutting conditions and cutting tools enables full optimization of the process to maximize results.
Talk to Us!